Tioga Terrace Master Bath Remodel
We have worked 3 days on tearout and rough-ins on this project. Now set to install custom shower mortar bed over the electric floor warming system.
Opened the floor for the plumber to install a new drain layout
Installation of the Wedi shower wallboard.
Installed the Easy Heat electric radiant floor heating system. A 240V kit was selected to run across the entire bath floor and shower area.
Keeping watch over the cable integrity with the Loud Mouth © cable alarm.
- loud mouth cable alarm system
- Yesterday we installed the custom shower mortar bed over the electric radiant heat system. We used a Schluter Kerdi drain with the ‘ oil rubbed bronze ‘ finish.
Once we had the shower mortar bed finished, the room got a good cleaning and then finished installing the rest of the 240V electric floor heat system throughout the bathroom and vanity areas.
Skim coat of high strength rapid setting mortar on top of the cables.
Today we were able to install the final waterproofing on the custom shower floor. We used Schluter Kerdi. The Kerdi drain comes with a complete set of prefabricated inside and outside corners.
Installed the Kerdi one side at a time
Roll back to apply the bonding mortar. I like to install the Kedi Band, and corners before the full sheets.
- Schluter Kerdi Band
- Finished Pictures
-
Thanks for a great project Lloyd & Maureen. Great design work from Cathy at Tri Bro Supply, all materials from our friends at Vestal Tile.