Vestal, NY Home Remodel

We have finally begun work on a large remodel project that was out for bidding around Christmas time. We received a 3D rendering of the Master Bath from Robert Kaner, the designer.

master-bath-rendering

We roughed in the Infinity stainless steel linear drain according to updated architectural drawings.

master-bath-floor-plan

20130214_090658

Then set the drain body in a mortar bed, started the Warm Tiles electric floor warming system

20130325_134712

After installing the heat cable system throughout the bathroom, we primed the floor,

20130327_154639

And poured Self Levelling Cement

20130327_172736

Once this dried, we double coat with AquaDefense waterproofing and crack isolation membrane available from our friends at Vestal Tile.

20130328_104229

Opened up the first crate of 12 x 24 Walker Zanger marble tile

20130328_110706

Managed to get about half of the bath floor installed using a mechanical floor leveling system

20130329_165220

About a week has passed since posting on this project, we have finished and covered the bath floor and began working on shower prep and wall tile installation.

20130411_104539

We glued in a 2″ Wedi panel for the back of the shower niche

20130411_105225

We made up some grout sample boards for color selection by the designer.

20130402_150736

Finished up the rest of the cement board, taped the seams and corners with thin-set mortar, and applied HydroBan waterproofing membrane

20130412_153109

First of 2 coats of waterproofing on the shower pan sets the pan fabric in place

20130412_153045

Managed to get some wall tile installed

20130412_153034

20130412_153040

20130409_170305

20130409_170259

We have been working on this Marble Master Bath, taking time to make all the details work together.

20130419_081254

This project marks the first time I have ever created extension jambs with any tile around windows. No trim is involved, we are called on by the designer to have mitered outside corners everywhere.

east-wall-sketch

20130419_081309

20130419_150526

We have installed most of the Epoxy Based grout

20130502_170251

20130502_170329

20130502_170316

20130502_170336

This project is finally in the home stretch, most of the trades are done now

20130629_122924

20130629_122910

20130629_122852

20130629_122831

20130629_125908

20130629_125921

20130629_125959