Crestview Heights Floor Tile

Working with a business friend John Giangrieco from Floor Coverings International to complete a 5 room floor renovation in Crestview Heights. The project got underway with prep work in the sunroom, with rigid foam underlayment to flush height with kitchen floor, and Schluter Bekotec modular screed system panels.

 

rigid foam panels installed to meet existing floor elevations

20131030_140824

Installing the Schluter Bekotec modular screed panels with required perimeter expansion seal

20131030_143724

Panels all installed, heating contractor will insert radiant heat tubes, then we can screed mortar over top, allow to dry then install our tile assembly

20131030_153659

OK, so the heating contractor has installed his heat tubing, pressure tested the system and turned it back over to us.

20131101_091758

Picked up the Laticrete 209 Floor Mud from the warehouse

20131031_143632

Started by dropping in screeds in the 16 x 11 Sunroom addition

20131101_104329

And just when a rhythm was developed, we ran out of material about 70% of the way through. Had to grab 6 more bags.

20131101_132220

We allowed some time for the cabinets to be installed and the rooms painted, Installed a lot of Schluter Ditra uncoupling membrane.

20131113_172442

Installing the 20″ rectified porcelain tile with a lippage elimination system

20131115_121313

Sunroom is completed

20131115_164358

 

20131115_164407